Attached are a couple of photos of the Queensgate Tower, GF Lobby & Lift Cars Refurbishment.
The project comprised the complete refurbishment of an existing GF main entrance lobby & 2 x lift cars of a 6 story office tower building, while the tower remained operational. This required staging of the works, installation of temporary hoardings, careful communication with building users, and delivery and loading in of all materials outside of operating hours.
The existing floor was badly out of level and Cemac relevelled & then installed new tile floor finishes, feature wall panelling & ceiling finishes and new lighting.
Lifts cars were fully stripped out with new floor, wall & ceiling finishes installed.